Early Childhood Education Infant Care Facility Construction
The project will create a new Infant Care Center serving 13-15 infants by using an existing 620 square foot building and adding an 1,800 square foot outdoor play yard. The yard will have a 5 foot wide slab on grade walkway alongside the western face of the Infant Care Center to provide egress to and from the Infant Care Yard. The plans level off the northern yard of the building via adding a free standing 5 foot high CMU retaining wall. The Infant Care Center shares the campus housing our preschool. The building currently underutilized can be converted into an infant care facility without major changes to the structure.
Plans
The following is a digital copy of the drawings for the project.
Scope of work for this project includes, but is not limited to the following:
1. Removal of existing drain swale
2. Install new underpin footing
3. Backfill with engineered fill
4. Installation of new drain pipes and catch basin & riprap
5. Installation of slab on grade walkway
6. Installation of composite deck finish
7. Installation of 6’ high retaining wall
8. Grading of yard per drawings
Bid Packet
Cliff Drive Care Center, with federal or government funding assistance from the City of Santa Barbara, is seeking qualified licensed contractors to submit sealed bids on a project involving yard and drainage improvements at 1435 Cliff Drive, Santa Barbara, California.
Sealed bids will be received by Cliff Drive Care Center, located at 1435 Cliff Drive, Santa Barbara, CA 93109. Sealed bids will be received up to 4:00 PM on December 13, 2018 at which time and place all bids will be opened.